Today I finished correcting all the text in the Post and Beam book (remember, we’re back to 3) and making it all uniform size. I finished two full days ahead of schedule, which might be the first time I’ve ever been in that position on this project. I sent James a draft to look over this afternoon, and checked to see how he was coming along with the edits to the manuscript. Since flip-flopping back to the original 3 book idea, the main thing that needs to be changed is the introduction. Other than that, the text stays fairly close to the same (or at least that’s what I’ve been told…).
I then moved on to laying out the first part of the appendix. I spent most of the evening fixing models of tools and remaking a calculator that got eaten by cyberspace singularities last week. I was going to stop there, but I kept going until I had the first page of the appendix roughed out (above). Then I emailed it to James and called him to get his opinion on the layout.
He had a brief moment of terror when he turned his computer on and saw that his email inbox had 4o11 new messages from someone named Facebook. A minute or two, and a bunch of confusion later he figured out he was signed into his teenage son’s account and he managed to calm down a bit. A minute or two after that he figured out how to sign in, and we were in business. He said the layout looked great, and to carry on with what I was doing. I told him I was packing it in for the night, but that I would be back at it first thing tomorrow.
An hour after that I finally walked away from the computer (no, not this one) having completed the rest of the text layout for the entire first section of the appendix. Tomorrow I have to model a new electric hoist, and block and tackle (fuck you cyberspace!) before I can finish the next part of the appendix. Hopefully they are both easier the second time, because I just realized I also have to redo these. Fuck.

